Carolinas AGC logo
Membership Info Create a Password CAGC Store Contact Us Home
site map
News and Events

NewsBreak! Articles > January 31, 2007

S. T. WOOTEN CORPORATION WINS BEST HIGHWAY-HEAVY PINNACLE AWARD

Hwy. 98 Bypass at Wake Forest , Wake Forest , NC
Contractor: S. T. Wooten Corporation, Wilson , NC

This bypass at US 1 involved widening, drainage, grading, paving, signals, structures and culverts, and required construction of a new location 4-lane divided facility. The many difficulties included delays of right-of-way acquisition, major utility conflicts, design revisions, addition of unplanned water and sewer utilities, revised signal plans, and multiple environmental issues. Despite challenges, Wooten, working with NCDOT, environmental agencies and local representatives, enabled the project to open to traffic 6 1/2 months ahead of schedule. The project's success was due to Wooten's proposed, designed and constructed solution previously untried in NC highway construction: an innovative earthwork overland conveyor system to move borrow material from the east side of US 1 over Richland Creek and US 1. The result: major savings of time and money.

Return to NewsBreak Pinnacle 2006 Story now
 

  News/Bulletin Board
  Calendar of Events
  NewsBreak! Sign-Up
  Daily Project Alert Sign-Up
  Publications
  Member Columns
  For the Media
  National AGC News
© 2008 Carolinas AGC All Rights Reserved. | Privacy Policy
1100 Euclid Avenue - Charlotte, NC 28203 | P.O. Box 30277 - Charlotte, NC 28230-0277
Phone (704) 372-1450 | Fax (704) 332-5032 | Email: shough@carolinasagc.org
Created By Matrix Group International, Inc.