| Title |
Number |
| |
|
| Framing Floors & Sills |
|
|
(Part 1): Layout & Construct A Floor Assembly |
6521 |
| (Part 2): Install Bridging, Sub
Floor, Floor System |
6522 |
Framing Walls |
|
| (Part 1): Layout Wall &
Partition Locations On Floor |
6523 |
| (Part 2): Assemble Corners, T's
And Headers |
6524 |
Framing Roofs |
|
| (Part 1): Layout, Cut & Install
Ceiling Joist |
6525 |
|
(Part 2): Layout, Cut & Erect Rafters For Hip Roofing |
6526 |
| (Part 3): Frame A Gable End
With A Vent Opening |
6527 |
| (Part 4): Erect Trusses For A
Gable Roof |
6528 |
| Metal Stud Construction:
Install A Metal Stud Wall With Openings |
6529 |
| Special Framing : Construct A
Stair |
6530 |
| Apply Paneling To Interior
Walls |
6542 |
| Apply Ceiling Tile |
6543 |
| Install Suspended Ceilings |
6544 |
| Install Interior Door With Wood
Jambs |
6545 |
| Install Interior Door With
Metal Jambs |
6546 |
| Install Window Trim |
6547 |
| Install Pre-Build Cabinets &
Countertops |
6548 |
| Install Shelves In A Closet |
6549 |
| Construction Training
Partnership |
9103 |